<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"><channel><title>Amtrak wraps first part of East River tunnel rehab, MTA says work strained LIRR service — Live Feed</title><link>https://www.live-feeds.com/feed/amtrak-wraps-first-part-of-east-river-tunnel-rehab-mta-says-work-strained-lirr-service</link><atom:link xmlns:atom="http://www.w3.org/2005/Atom" href="https://www.live-feeds.com/feed/amtrak-wraps-first-part-of-east-river-tunnel-rehab-mta-says-work-strained-lirr-service/rss.xml" rel="self" type="application/rss+xml"/><description>Continuously updated, source-cited coverage.</description>
<item><title>Amtrak completes East River tunnel rehab phase, LIRR service resumes</title><link>https://www.live-feeds.com/feed/amtrak-wraps-first-part-of-east-river-tunnel-rehab-mta-says-work-strained-lirr-service</link><guid isPermaLink="false">https://www.live-feeds.com/feed/amtrak-wraps-first-part-of-east-river-tunnel-rehab-mta-says-work-strained-lirr-service#u44963</guid><pubDate>Tue, 18 Aug 2026 20:35:57 +0000</pubDate><description>Amtrak has completed the first phase of its East River tunnel rehabilitation project, restoring train service in one of the tunnels. The project, which began after Superstorm Sandy damaged the tunnels in 2012, aims to improve the reliability and safety of rail service. Long Island Rail Road (LIRR) trains are set to return to the rebuilt tunnel. The work has strained LIRR service, with some disruptions expected to continue.Why it mattersThe East River tunnel rehabilitation project is crucial for the region&amp;#039;s rail network, which was severely impacted by Superstorm Sandy in 2012. The project</description></item>
</channel></rss>